Now · 3 log entries

The work journal

A changelog for my work. What I researched, built and learned — newest first. This page is why the rest of the site stays honest.

LOG-003 · Jul 6, 2026

The OS goes live

Built — this site. Next.js, Tailwind, MDX; every collection is a folder of files, so new work plugs in without touching the design. ⌘K works.

Learned — designing for a 30-year horizon mostly means deleting features: everything that survived is a list, a file, or a log.

Tomorrow — first real artifact uploads for the Dabba case study, and wiring the resume PDF.

LOG-002 · Jul 2, 2026

Voice pipeline week

Built — the n8n voice-note → transcription → source-store flow (experiment log). One week of hands-free inputs and it goes to production.

Researched — how much filler to strip from transcripts before the voice fingerprint degrades. Answer so far: almost none.

Learned — the founder's deletions teach the prompt more than his additions. v9 is the first version built mostly from what he cuts.

LOG-001 · Jun 27, 2026

Funnel review + interviews

Reviewed — the application funnel. Referral-path applications continue converting several times better than cold; reallocated the week's outreach accordingly.

Progressed — two interviews moved to next rounds. Prep bank grew by six answers, all pulled from real case studies on this site.

Learned — pointing interviewers at a written case study before the call changes the conversation entirely: it starts at "how did you build this" instead of "tell me about yourself."